DESIGN REVIEW · V6.13 Test environment · No emails or advertising trackingPrivate dashboard ↗

solar · 2025-07-15

Hybrid Solar Powering JMG Head Office – A Smart Move Toward Energy Independence

Hybrid Solar Powering JMG Head Office – A Smart Move Toward Energy Independence

Project Title: Hybrid Solar System Deployment at JMG Head Office

Client Location: 25 Ologun Agbaje Street, Victoria Island, Lagos

Completion Status: July 2025

Division: JMG Solar Division

Project Overview

This in-house project reflects JMG’s leadership in renewable energy by transforming its Head Office into a low-emission, high-efficiency energy hub. The commercial hybrid solar setup is designed to drastically reduce reliance on diesel generators while showcasing the viability of green power solutions in an urban commercial setting.

Objectives

Cut monthly diesel consumption and operating costs

Increase energy reliability in a high-demand business environment

Serve as a working model for JMG clients

Reduce carbon footprint and contribute to long-term sustainability

Technical Evaluation

JMG’s engineering team conducted a full load analysis using the Fluke Load Analyzer and designed the solar system through advanced simulation with PV Syst Software.

System Specifications & Brands Used

System Size:

129kWp solar array

100kW hybrid inverter system

122.9kWh High Voltage lithium-ion battery storage

Solar Panels: 225 units of Longi 575W panels

Inverters: Deye High-efficiency hybrid inverter system

Battery Storage: Advanced Deye High Voltage lithium-ion modules (122.9kWh)

Mounting: Mixed roof-mount and steel solar carport

Monitoring: Smart digital monitoring for real-time performance tracking

Performance & Energy Savings

Energy Output: 15.48 MWh/month or 185.76 MWh/year

Load Coverage: 90% of total site demand

Carbon Emission Offset: 71,283.38 kg of CO₂ annually

· Diesel Savings: Over 2,900 liters saved per month, representing about ₦3,200,000 in savings per month.

· Maintenance Savings: Lower operational strain on generators

Key Stakeholders

Client Representative: Hussein Abbas, Head of Department, Solar Division

JMG Project Lead: Hussein Abbas

“This project isn’t just an installation—it’s a statement. We’re leading by example and turning our head office into a smart energy blueprint for the future.”— Hussein Abbas, HOD, Solar Division, JMG

Get a quote for your solar power project from JMG Solar Division.


← All stories